Lower Thames Crossing video fly-through

There is a very useful video fly through of the Lower Thames Crossing design layout, which helps understand how the existing roads and accessibility will be changed. Shorne West (and Gravesend East and Riverview) residents should note that so far in the A2 junction design there will no longer be direct and easy access to […]

LOWER THAMES CROSSING UPDATE – 10th October 2018

As notified previously, the Highways England (HE) Lower Thames Crossing Statutory Consultation has been launched today (10th October 2018) and will run for 10 weeks until 20th December. Some of the significant changes that have been made since the previous consultation are: – Extending the tunnel around 600m, bringing the entrance south of the A226 […]

LOWER THAMES CROSSING UPDATE

Highways England have announced that the Lower Thames Crossing statutory consultation phase will start next Wednesday 10th October and run until Thursday 20th December. As previously, there is no need to respond rapidly – it is better to read as much of the (vast) accompanying documentation as you can and then include everything that you […]